East Anglia Renovations gave us the task of fabricating a gable end frame for one of their latest products.
The job consisted of a gable end frame with lintel plates, a large ridge beam, plus a SHS post with a UB below to support the load of the post and ridge beam above.
The apex of the gable end was welded using a full penetration weld, using the TIG process, by a coded welder.